          In the last two hundred years there have been great changes in the method
of production of goods. This is now also true of the building industry; for
mechanization has been introduced. System building can save both time and money.
The principle of system building is that the building is made from a set of
standard units. These are either made at the building-site or at a factory. Some
designers, in fact, are standardizing the dimensions of rooms. They are made in
multiples of a single fixed length, usually ten centimeters. This is called a
modular (标准件的) system, and it means that manufactures can produce standardized
fittings at a lower cost. The most important fact about system building is its
speed. A ten-storey flat, for example, can be completed in four months.
          There are several new methods of system building. One is the panel method.
In this case, the construction company sometimes erects a factory on the site.
The walls and floors of the building, called panels, are cast in a horizontal or
vertical position. Conduits for electrical wires and sleeves for pipes are cast
in the panels when they are being made. The moulds for making these castings are
situated all around the building.
          After the concrete panels are cast, they are allowed to set and harden for
a week. Next they are lifted by a tower crane on to any section of the building.
There the panels are cemented together at their joints and the floor covering is
laid.
          After the panels have been cemented together, the crane lifts a case into
the area. It contains all the fittings to be installed, such as wash-basins,
radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters
and electricians, follow behind to complete the work.
          In some building developments, in some countries, whole flats with internal
features like their bathrooms, bedrooms and connecting stairs, and weighing as
much as twenty tons, are carried to the building-site ready-made. A giant
overhead crane is used to lift them into position. In the future, this method
may become more widespread.
          1. Which of these statements is TRUE of system building?
          A. It employs more men.
          B. It is difficult and dangerous.
          C. It can save both time and money.
          D. It means less mechanization.
          2. The main difference between panel method and the method discussed in the
last paragraph is_______.
          A. the latter uses ready-made internal features
          B. panels are cast in a level position
          C. the former is used to build walls and floors while the latter to
construct bathrooms or bedrooms
          D. the former is more expensive than the latter
          3. According to the passage, the principle of system building is
that_______.
          A. construction methods are safer
          B. buildings are made from a set of standardized units
          C. similar buildings can be produced
          D. all units are produced on the site
          4. What lifts the concrete panels onto the building?
          A. Cranes.
          B. Man-power.
          C. Pulleys.
          D. Hydraulic jacks.
          5. The usual fixed length in the modular system is_______.
          A. twenty centimeters
          B. ten millimeters
          C. fifty centimeters
          D. ten centimeters
            
            
回复

使用道具 举报

0

主题

6818

帖子

1万

积分

论坛元老

Rank: 8Rank: 8

积分
14150
发表于 2018-12-8 11:45:33 | 显示全部楼层

          参考答案:
          1. C 2.A 3. B 4. A 5. D
            
            
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|手机版|Archiver|新都网

GMT+8, 2025-1-21 13:06 , Processed in 0.078412 second(s), 7 queries , WinCache On.

Powered by Discuz! X3.4

© 2001-2017 Comsenz Inc.

快速回复 返回顶部 返回列表